Sep 21, 2023 The podcast discusses the challenges and costs of interconnecting electricity generators to the grid, with a focus on Texas. It explores the backlog of projects waiting to connect, recent reform efforts, and the concept of cluster studies. The interconnection process in ERCOT is explored, highlighting the use of generator curtailment and comparing it to the PJM electricity market. The relationship between generator curtailment and interconnection requests in Texas is examined. Finally, there is a discussion on proposing a two-step study process and reforming the impact threshold for assigning upgrades to energy generation resources.
AI Snips
Chapters
Transcript
Episode notes
Texas Interconnection Success
- Texas has installed 40+ GW of wind power, nearly 30% of all U.S. capacity.
- Texas also boasts 19 GW of solar, second only to California, demonstrating its interconnection success.
ERCOT's Interconnection Approach
- ERCOT's key is not relying on interconnection to fund grid upgrades, enabling faster, cheaper connections.
- Generators accept curtailment risk in exchange, managed through a separate transmission planning process.
System Impact Studies
- Outside Texas, 'system impact studies' assess a generator's effect on the grid, often leading to required upgrades.
- This process analyzes power flow, contingencies, and potential overloads, impacting connection timelines.