253: Rapid Execution in Industrial Automation: From FEED Study to Recommissioning in Five Months featuring Cassy Gardner and Chris Schleich of E Tech Group
6 snips
Sep 16, 2025 Join Cassy Gardner, Corporate Development Director at eTech Group, and Chris Schleich, Director of Engineering, as they delve into the high-stakes world of industrial automation. They share a riveting case study on reviving a mothballed solar facility, revealing how overlooked automation can lead to disaster. Discover the critical role of Front-End Engineering and Design (FEED) studies and why early automation planning is essential. With insights on fostering client trust and balancing rapid execution, their journey blends technical expertise with invaluable life lessons.
AI Snips
Chapters
Transcript
Episode notes
Automation Is A Critical 10%
- Automation often gets discovered only after construction begins, creating costly gaps.
- Investing the critical 10% for automation shapes whether manufacturing works as intended.
Start Automation Planning Early
- Start automation planning earlier than you think and engage experts as soon as possible.
- Early involvement prevents stressful, costly facility startups and uncovers what you don't know.
Use A FEED Study To De-Risk Fast Projects
- Use a FEED (front-end engineering and design) study to resolve unknowns before execution.
- Send the right engineer on-site immediately to convert uncertainty into a clear action plan.
