33sec snip

Catalyst with Shayle Kann cover image

Understanding the transmission bottleneck

Catalyst with Shayle Kann

NOTE

Time and Cost of Interconnection: A Growing Challenge

Interconnection to the bulk power system now takes over four years on average, more than doubling the processing time compared to previous standards. The associated costs have also escalated significantly, rising from around $100 per kilowatt to a range between $200 and $800, and in some cases even reaching $1,000 per kilowatt. This trend indicates substantial challenges for generators navigating the interconnection process.

00:00

Get the Snipd
podcast app

Unlock the knowledge in podcasts with the podcast player of the future.
App store bannerPlay store banner

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode

Save any
moment

Hear something you like? Tap your headphones to save it with AI-generated key takeaways

Share
& Export

Send highlights to Twitter, WhatsApp or export them to Notion, Readwise & more

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode