Catalyst with Shayle Kann cover image

Understanding the transmission bottleneck

Catalyst with Shayle Kann

00:00

Transmission Bottleneck

Permitting reform in the US could relieve the transmission bottleneck. The US needs more transmission capacity to build new electricity generation and electrify, meeting load growth. The Princeton Net Zero America study estimates the US might need to triple HVDC transmission capacity by 2050 or increase capacity by 60% by 2030.

Play episode from 01:57
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app