Going Nuclear with Justin Huhn and Trevor Hall cover image

Doomberg on this Year's Nuclear Energy Challenges

Going Nuclear with Justin Huhn and Trevor Hall

NOTE

Delayed Uranium Production in Kazakhstan

The method of mining uranium in Kazakhstan involves using ISR mines, which require drilling a series of wells and impregnating the underground ore body with sulfuric acid. It takes about eight months from the time of drilling the wells to the actual production of uranium, as the sulfuric acid needs time to interact with the uranium.

00:00
Transcript
Play full episode

Remember Everything You Learn from Podcasts

Save insights instantly, chat with episodes, and build lasting knowledge - all powered by AI.
App store bannerPlay store banner