1min snip

The Green Blueprint cover image

Making sense of advanced nuclear’s stumbles

The Green Blueprint

NOTE

The Disconnect Between Construction and Operation Incentives in Nuclear Plants

The cost of nuclear projects is mainly driven by construction and design, rather than hardware. In South Korea, the same people who design, build, operate, and maintain nuclear plants contribute to an integrated construction process. However, in the US, there is a disconnect between those who operate and those who design and build, leading to differing incentives and sometimes perverse incentives. To address this, we should change how construction is integrated in the US rather than focusing solely on reactor design. Small modular reactors (SMRs) are seen as a nuclear engineering solution to a financial problem, but what we truly need is a financial solution to this issue.

00:00

Get the Snipd
podcast app

Unlock the knowledge in podcasts with the podcast player of the future.
App store bannerPlay store banner

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode

Save any
moment

Hear something you like? Tap your headphones to save it with AI-generated key takeaways

Share
& Export

Send highlights to Twitter, WhatsApp or export them to Notion, Readwise & more

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode