a16z Podcast cover image

The Electrification of Everything: From Sky to Sea

a16z Podcast

NOTE

Interoperability and Power Requirements in Electric Vehicles

Bethesda, Maryland has the largest electrified depot in the country, running 200 school buses and requiring five megawatts of power. The challenge is ensuring reliable charging for the vehicles. Additionally, recreational boats consume more energy than fully loaded semi trucks, with the ARC One boat having a battery capacity twice the size of any car on the market today.

00:00
Transcript
Play full episode

Remember Everything You Learn from Podcasts

Save insights instantly, chat with episodes, and build lasting knowledge - all powered by AI.
App store bannerPlay store banner