The Green Blueprint cover image

New demand is straining the grid. Here’s how to tackle it.

The Green Blueprint

NOTE

Unlocking Extra Capacity in Power Systems

Utilizing dynamic line rating and transmission optimization can help in redirecting power flows and controlling traffic to increase system capacity. By combining these technologies intelligently, it is possible to incrementally unlock additional capacity in power systems. A recent RMI study on the PJM system showed the potential to unlock over 6 gigawatts of extra capacity in a 90 gigawatt system, highlighting the significant impact of leveraging these technologies.

00:00
Transcript
Play full episode

Remember Everything You Learn from Podcasts

Save insights instantly, chat with episodes, and build lasting knowledge - all powered by AI.
App store bannerPlay store banner