Company Interviews

Crux Investor
undefined
Nov 17, 2026 • 28min

Emperor Metals (CSE:AUOZ) - Targeting High-Grade Starter Pits Ahead of Planned PEA

Interview with John Florek, President & CEO of Emperor MetalsOur previous interview: https://www.cruxinvestor.com/posts/emperor-metals-cseauoz-ai-driven-modelling-doubles-gold-resource-in-quebec-11877Recording date: 16th November 2026Emperor Metals (CSE: AUOZ) is advancing two gold projects in Quebec’s Southern Abitibi Greenstone Belt. The flagship, Duquesne West, hosts a July 2025 maiden inferred resource of 26.9 Mt grading 1.69 g/t Au for 1.46 Moz, modeled at $2,300/oz gold. The second, Lac Pelletier, is under a purchase agreement and sits about 30 km south. It holds a 1,000 tpd mining permit valid to 2030.The 2026 program at Duquesne West has finished over 20,400 m of drilling across 66 holes, and results are out for 55 of them. Emperor reported 24.8 m at 7.0 g/t Au from about 85 m vertical depth, 8.4 m at 8.7 g/t Au from about 41 m, 18.9 m at 4.0 g/t Au from about 100 m and 8.6 m at 6.1 g/t Au from about 46 m. All of these sit inside the conceptual Phase 1 pit area. President and CEO John Florek said the drilling is returning three times the thickness or grade of historical holes, and he credits AI-built 3D models that track where structures controlling the gold intersect.These results support a phased open-pit plan. Florek described starter pits about 500 m long, 200 m wide and up to 100 m deep. Management is targeting 3 to 6 g/t Au in the starter pits and roughly 2 g/t Au across an ultimate pit about 1.8 km long, 800 m wide and 400 m deep. The current pit-constrained resource grade is 1.11 g/t Au. Lower stripping ratios in the starter pits could shorten payback. Below the pit, Emperor is targeting underground grades of 4 to 6 g/t Au, and an overall 3 to 5 Moz from surface to 1,000 m depth.The project’s features favor low costs. Cyanide leach recoveries ran 90% to 94% for replacement-style ore. Sulfides are low, with no meaningful arsenic or copper. Florek said six mills are within a 30 to 40 minute drive, so Duquesne West could be developed as satellite feed. He estimated this would save $500 million to $1 billion in capital costs and said it would let the project work at $1,800 gold.Lac Pelletier offers a quicker route to production. It has 3.3 km of underground development, a historical resource of 227,000 oz at 3.9 g/t Au (not treated as current) and roughly C$70 million spent on it previously. Florek said the permitted rate could support about 40,000 oz per year. Emperor is targeting the transfer of surface-rights liabilities from Eldorado Gold in late November or early December 2026. A dewatering permit, rehabilitation and an updated NI 43-101 report follow.Upcoming catalysts are the remaining assays, 3,000 to 5,000 m of fully funded drilling, an updated Duquesne West resource targeted for the first half of 2027, and a PEA that could start around June or July 2027 and take 6 to 8 months. The main risks are that the whole resource is inferred, the starter-pit grades are targets rather than modeled figures, and both the Lac Pelletier restart and the PEA timing depend on approvals and market conditions. Florek put the market capitalization at about $77 million. Working capital was estimated at C$5.4 million as of September 2026.View Emperor Metals' company profile: https://www.cruxinvestor.com/companies/emperor-metalsSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 16, 2026 • 26min

i-80 Gold (TSX:IAU) - Fully Funded, Lone Tree Restart Anchors Multi-Mine Nevada Growth Plan

Interview with Richard Young, President & CEO of i-80 Gold  Our previous interview: https://www.cruxinvestor.com/posts/i-80-gold-tsxiau-granite-creek-feasibility-done-lone-tree-refurbishment-on-track-for-2027-12201Recording date: 11th November 2026i-80 Gold Corp. is in the middle of a two-project build in northern Nevada that management says will turn a small, high-cost producer into a mid-tier one. Speaking in Zurich, President & CEO Richard Young said the company produces 40,000 to 50,000 oz of gold a year today. It is targeting 150,000-200,000 oz in 2028, 400,000-500,000 oz in the early 2030s, and more than 600,000 oz by the mid-2030s. He said the company is fully funded for the plan.The center of the plan is the Lone Tree plant, a $430M refurbishment of an autoclave and CIL facility. Work began in Q3 2025. Procurement is about 80% complete and trending about 1% under budget. Commissioning is targeted for late 2027. i-80 says it is one of only 2 companies in Nevada with permitted autoclave facilities, alongside Nevada Gold Mines. Young said the restart will cut processing costs by about $1,500/oz by ending the toll milling that currently handles i-80’s refractory ore. He estimated long-term AISC at about $2,000/oz for the underground mines and $1,500/oz for the open pits, for a blended figure near $1,750/oz.Granite Creek Underground is the producing mine. Its September 2026 FS declared an initial reserve of 556,500 oz at 7.87 g/t Au, with an 8.5-year life and AISC of $1,915/oz for 2028-2032 at $2,750 gold. M&I resources rose 229% from the PEA. Young expects drilling to extend the life to 15-25 years. Two new dewatering wells and a water treatment plant are being commissioned in Q4 2026 to lower the water table and lift mining rates toward about 75,000 oz a year.Archimedes, the second underground mine, starts ore mining in Q4 2026 and is on schedule and budget. Upper-zone material is mostly oxide and heap leachable. Leaching on Ruby Hill’s existing permitted pads costs about $10-15/t, against roughly $150/t to truck and autoclave refractory ore at Lone Tree. i-80 lowered the cut-off grade from 5 g/t to 4 g/t as a result. Because Granite Creek and Archimedes can fill Lone Tree for at least a decade, Cove has been deferred.Mineral Point is the step change. It is a ~$1B heap leach open pit, with about a third of the cost being a year of pre-strip, targeting ~300,000 oz AuEq a year for 20-25 years. It holds about 7.5 Moz AuEq in M&I resources. The first 35 holes of the 2026 program included 19 step-outs, all mineralized, and one returned 1.33 g/t Au and 39.2 g/t Ag over 225.6 m. Permitting starts late 2026. A bank revolver is planned as backup liquidity without further dilution.Learn more: https://www.cruxinvestor.com/companies/i-80-goldSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 15, 2026 • 28min

Dune Oil (CSE:DUNE) - Targeting First Production at Türkiye's M47 With C-1 Sidetrack

Interview with Scott Lower, CEO of Dune OilOur previous interview: https://www.cruxinvestor.com/posts/dune-oil-csedune-fast-track-to-cash-flow-11473Recording date: 11th November 2026Dune Oil (CSE: DUNE) is earning a 29% working interest in Block M47, a conventional light-oil discovery in the Cudi-Gabar region of southeastern Türkiye. The region has grown from no output in 2021 to 83,300 bbl/d, and Turkish Petroleum (TPAO) is targeting more than 100,000 bbl/d in 2027. Chapman Hydrogen and Petroleum Engineering assigns M47’s North Field a 2C contingent resource of 27.6 MMbbl, company gross. That carries an unrisked NPV10% of US$734 million.There is more activity around the block. TPAO announced the Gaziler and Çardaklı discoveries, taking its producing fields in the region from 8 to 10. Gaziler lies directly north of M47, with its first well 4 to 5 km from the block. TPAO cites about 135 MMbbl of oil-in-place potential and 40 planned wells. TPAO has also identified 22 well locations in its MIG field, 1 to 2 km north of Dune Oil’s licenses. President & CEO Scott Lower said these northern discoveries de-risk, on an exploration basis, a part of the block the company had not been targeting. Dune Oil has not verified TPAO’s figures.Management is spending in order of certainty. The first priority is a sidetrack of the C-1 discovery well, followed by a step-out well about 200 m east or west on the same reservoir. Exploration of the northwest and the South Lead comes after cash flow.C-1 has not produced on a sustained basis. Lower attributed this to 3 failed cement jobs that prevented isolation of the zone, a technical problem that can be fixed. The completion plan favors a 200 m to 300 m lateral across the fractured crest of the anticline. The same approach is used in these carbonate reservoirs in Oman, Saudi Arabia, Iraq, and Iran. Chapman notes C-1 was drilled on the structural flank, hit only part of the oil column, and has no sustained production test.The block’s location supports its economics. Türkiye imports more than 85% of the roughly 1 million bbl/d it consumes. M47 oil can be trucked 130 km to the Tüpraş Batman refinery for about US$5/bbl. At US$72 oil, the company estimates a US$50/bbl netback after a US$9 royalty and US$8 of opex. It also estimates a well payback of about 2 months and US$5.5 million of first-year netback per well.Dune Oil is raising up to C$8.3 million with a C$1 million promissory note a the only other obligation Lower cited, which leaves about C$7.3 million. Lower estimated about US$1.3 million net for C-1 work, US$500,000-600,000 for seismic, and about US$2.2 million for Dune Oil’s share of a new well. The 45 km seismic program mobilizes in November 2026, with completion targeted for February 2027.View Dune Oil's company profile: https://www.cruxinvestor.com/companies/dune-oilSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 13, 2026 • 19min

Midterms Priced In, Commodity Views Intact: Post-Election Market Read

Recording date: 11th November 2026Olive Resource Capital (TSXV:OC) updates investors on cash deployment after the US midterm elections. Executive Chairman Derek Macpherson and President, CEO and CIO Samuel Pelaez said the fund has deployed only about 5% of a cash balance Macpherson called sizable for this time of year. Most of the capital remains reserved for a seasonal entry point.On the election, Macpherson said Democrats won the House, the Senate and a number of governorships, which he read as a referendum on the cost of living, high prices and elevated diesel costs. Pelaez noted that sitting presidents almost always lose seats at the midterms and that the following six months have tended to be strong for equities. He said most of the outcome appears priced in. Outside crude oil, commodities have been flat, the US dollar remains strong and volatility has been lower than expected. The exception was aggressive selling in AI stocks.That AI selloff carries two commodity read-throughs. First, money rotating out of a large sector typically moves into gold, and the hosts described the rotation as an early positive sign for gold. Second, the copper demand case tied to AI capex looks less certain. Pelaez argued that data center ambitions presented over the past 12 months were hard to realize because projects still need permits, community support and new power plants.On policy, Pelaez expects support for onshoring metals production to continue as a bipartisan priority. He expects it to weaken at the fringes, with less direct government funding of projects and less incentive to maintain aggressive tariffs on specific metals. Macpherson said copper is most exposed. Tariff threats drove a large US inventory build, and a short-term soft spot is possible as it runs down. The copper market remains in a slight supply deficit this year, and he sees no change to long-term fundamentals.The macro view is unchanged. Both parties allow deficit spending. After a hot CPI print, markets are pricing about an 84% to 85% probability of a quarter-point Fed hike, with the policy rate around 3.75% to 4%. Pelaez called the move fully priced in and largely insignificant, with US government bonds yielding about 5%. He focuses on timing instead. The Fed meeting date has historically coincided with the seasonal bottom after third-quarter tax selling and the best entry ahead of the Christmas rally and first quarter, the strongest seasonal period for commodities. A strong US dollar may still produce further washouts first.On oil, peace talks on Ukraine and Iran have pulled prices lower. Both hosts doubt the talks will produce lasting peace. Macpherson said structural demand will keep oil prices up, with a floor a little below current levels rather than a return to pre-war prices.Olive does not wait for macro events before acting, because priced-in outcomes can reverse quickly and unpositioned investors can miss a 5% to 10% move. Management is watching undercapitalized juniors that need to raise funds before year end for specific opportunities.Learn more: https://cruxinvestor.comSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 13, 2026 • 34min

Tectonic Metals (TSXV:TECT) - Funded to Maiden Alaska Gold Resource and PEA Targeted by 2027

Interview with Tony Reda, President, Founder and CEO of Tectonic Metals Inc.Recording date: 11th November 2026Tectonic Metals (TSXV:TECT) is advancing the Flat Gold Project in southwestern Alaska toward its first Mineral Resource Estimate (MRE). The company is targeting the maiden MRE for the Chicken Mountain target in Q1 2027 and a Preliminary Economic Assessment (PEA) in Q2 2027 where management is targeting a 5 Moz resource. Co-Founder, President and CEO Tony Reda defines a tier-one mine as 500,000 oz of annual production over a 10-year life, in the lowest cost quartile and a safe jurisdiction.Flat covers 99,840 acres of predominantly Doyon, Limited land. Doyon is one of Alaska’s largest Native regional corporations and has invested more than $10M in Tectonic. Production and impact benefit agreements have been in place since the partnership began in 2018. The district has produced 1.4 Moz of placer gold, the third-highest total of any placer district in Alaska. It sits across a fault from NovaGold’s refractory Donlin deposit, which holds 39 Moz in M&I resources.Drilling at Chicken Mountain has defined 3.3 km of strike, about 700 m wide and 300 m deep, open in all directions. Drilling there has returned gold in all 206 holes to date. Highlights include 9.94 g/t Au over 36.58 m, including 15.73 g/t over 22.86 m, and 8.84 g/t over 13.72 m at the Adit Zone. More than 90% of the mapped monzonite intrusion has not been drilled, and more than 120 holes are awaiting assays from a 33,000 m 2026 program.Metallurgy is the core of the development case. Two columns on 3/4-inch crushed material recovered 96% in 71 days and 91% in 69 days, with no separation of oxide from fresh rock. Reda attributes this to a low-sulfur, fracture-controlled system, which cyanide can reach easily. Tectonic reports low cyanide consumption, no agglomeration requirement and no preg-robbing. Reda said crushing and grinding typically make up about 50% of AISC, so a coarse crush supports a low-cost operation at an off-grid site. Another 15 columns, run under chilled conditions, are due before year-end 2026.Black Creek, 6 km north, is an emerging second gold center. 17 of 18 holes have hit gold from 1,600 m of drilling, including 4.50 g/t over 48.77 m and 5.61 g/t over 41.15 m. The host is hornfels, different from the monzonite at Chicken Mountain. Metallurgical samples were collected in 2026, and step-out drilling is planned for 2027.The balance sheet supports the plan. Tectonic held $83.2M in cash at June 30, 2026, has no debt, and 55% of its shares are held by institutions, including VanEck, Franklin Templeton and Crescat. Management is weighing an 80/20 or 70/30 split between conversion and expansion drilling, depending on the share price at the next raise.Learn more: https://www.cruxinvestor.com/companies/tectonic-metalsSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 13, 2026 • 25min

Americas Gold and Silver (TSX:USA) - Record Quarter Funds Higher-Grade Silver-Copper Push

Interview with Oliver Turner, Executive Vice President of Corporate Development of Americas Gold and Silver Our previous interview: https://www.cruxinvestor.com/posts/americas-gold-silver-tsxusa-doubles-galena-hoisting-as-mexico-drilling-widens-the-upside-12052Recording date: 11th November 2026Americas Gold and Silver (TSX:USA) is running a two-asset funding model. Cosalá in Sinaloa, Mexico, generates cash, and the company is spending it on a sequenced rebuild of the Galena Complex in Idaho’s Silver Valley. Executive Vice President of Corporate Development Oliver Turner set out the plan following a record third quarter.Consolidated silver production reached 800,458 oz in the third quarter of 2026, with Cosalá at 415,879 oz and Galena at 384,579 oz. Year-to-date output is 2.3 Moz against 2026 guidance of 3.2 to 3.6 Moz at AISC of US$30-35/oz. Turner said the fourth quarter must be bigger than the third for the company to reach the low end of guidance, and that it is on track. First-half AISC was US$36.92/oz, above the guidance range. Available liquidity was US$113M at September 30, 2026, including US$63M of cash and US$50M undrawn on the SAF credit facility.At Cosalá, mining moved in 2026 from the zinc-dominant San Rafael zone into the EC120 orebody, which has a 7-year mine life under the current preliminary economic assessment. Turner said grades are running above 125 g/t Ag against a modeled average of just over 100 g/t, and drilling returned 20.5 m at 654.7 g/t Ag and 1.5% Cu just outside the 2025 Inferred boundary. The company plans to update the EC120 numbers next year.At Galena, the team used time studies that follow one ton of rock from face to mill. The first round identified hoisting and the mining method as the primary bottlenecks. The No. 3 Shaft skipping rate rose from 40 to 105 tph, hoisting is targeted at 1,350 stpd, and the mine is shifting from underhand cut and fill to long hole stoping toward a 70/30 split. Turner said 23 long hole stopes have been mined to design limits. Secondary fixes followed: four new grizzlies cut tram loading from 5 minutes to 20 seconds per 4-ton car, fiber optics now run through the mine, and Turner cited a 30% improvement in breaking rock at the face.The next phase targets grade as well as tonnage. Galena’s silver-copper ore carries roughly 2 times the silver grade of its silver-lead ore, and reaching it requires waste development. Turner said the mine had about a month of waste development ahead of mining when the team arrived, against a rule of thumb of about 2 years. The paste fill plant is due for completion in the first quarter of 2027, the company is validating dry stack tailings, and the mill is targeted to rise from about 750 to 1,200 stpd.Crescent, 9 miles away, will feed the Galena mill once a secondary egress is connected, and the presentation describes potential for about 1.5 Moz/yr. Turner described a first target of 5 Moz/yr at Galena, with engineering for a larger complex running well into 2027.Learn more: https://www.cruxinvestor.com/companies/americas-gold-silver-corporationSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 12, 2026 • 21min

Santacruz Silver (TSX:SCZ) - Bolivar Back on Track, Zimapan Gains Set Up 2027 Growth

Interview with Arturo Préstamo Elizondo, Executive Chairman & CEO, Santacruz SilverOur previous interview: https://www.cruxinvestor.com/posts/santacruz-silver-mining-tsxscz-cash-growth-production-increase-more-acquisitions-under-review-12122Recording date: 11th November 2026Santacruz Silver Mining (TSX:SCZ) is a multi-asset silver-zinc producer with four producing mines in Bolivia and Mexico, the San Lucas ore-sourcing business, and the Soracaya development asset. Executive Chairman and CEO Arturo Préstamo Elizondo said the company spent 2026 preparing its operations to run efficiently whatever metal prices do. He is targeting growth of at least 20% in 2027, measured in profitable ounces.The price backdrop explains the focus. Silver price fell from $84.39/oz in Q1 2026 to $62.73/oz in Q3. Zinc price rose from $3,243/t to $3,830/t over the same period. Santacruz drew 53.2% of H1 2026 revenue from silver and 40.3% from zinc. Préstamo Elizondo said he is bullish on both metals but sees some cost inflation across the industry.After the May 2025 water inflow, dewatering ran on time and on budget, and Bolivar is back on track in Q4. Q3 silver output was 408,087 oz, up 19% QoQ and 209% YoY. Head grade rose to 186 g/t from 165 g/t. Two high-grade silver blocks are targeted for production in mid-to-late Q1 2027.Santacruz invested a little more than $15M at its Mexican Zimapan mine over 15 months, after encouraging results at level 960, and is targeting payback within 1.5 years. The program raises head grades, adds roughly 6,000 t of monthly throughput on a 74,000 t base, and improves recoveries. Management is targeting an 8% to 10% production increase. Silver recovery rose from 72% to 76% in Q3, lifting silver output 3% on flat throughput. Mine life is more than 8 years, and a first-time Zimapan resource report is due with updated estimates across all mines.For inventory policy, geology must replace at least 1.3x the tonnage mining depletes, and each mine aims to hold at least 5 years of mine life ahead. Prepared areas give management flexibility if costs squeeze margins. Exploration capex can flex, but infill drilling is not cut.San Lucas Q3 throughput fell 19% to 92,921 t because company mines used more mill capacity. The release also cites lower purchased-ore grades. A newly acquired 500 tpd mill dedicated to San Lucas is targeted for commissioning in Q4 2026, with management targeting another 10% growth next year.Santacruz H1 2026 revenue was $241M (+68%) and adjusted EBITDA $89M (+64%). Realized silver averaged $76.33/oz against AISC of $25.34/oz. Cash and liquid securities were $73M at June 30. Préstamo Elizondo said treasury was around $130M at the end of Q3, with no streams or royalties. The company has identified a few acquisition opportunities and will only pursue conservative, accretive deals, as with Zimapan and the Glencore Bolivian assets.View Santacrux Silver's company profile: https://www.cruxinvestor.com/companies/santacruz-silver-miningSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 12, 2026 • 17min

New Found Gold (TSX:NFGC) - Q3 Operating & Financial Results

Interview with Keith Boyle, Director & CEO of New Found GoldOur previous interview: https://www.cruxinvestor.com/posts/new-found-gold-tsxnfgc-queensway-pea-mre-update-12474Recording date: 11th November 2026New Found Gold has completed its first quarter of commercial production at the Hammerdown Gold Mine in Newfoundland and Labrador, producing 4,863 ounces of gold at 2.77 g/t with zero lost-time incidents. The company sold 6,935 ounces at an average realized price of US$4,285 per ounce, generating C$41.6 million in revenue and C$11.2 million in operating cash flow before working capital changes. Income from mine operations reached C$18.6 million, or 45% of revenue.All-in sustaining costs of US$3,279 per ounce came in US$904 above the Hammerdown PEA. CEO Keith Boyle attributed the gap mainly to three ramp-up items. Stripping in the Rumbullion pit, brought forward from early 2027 to avoid winter conditions, added about US$350 per ounce. An 11% lower head grade added about US$135 per ounce, and infill drilling to upgrade Inferred resources added further cost. Management is targeting a life-of-mine AISC of around US$2,500 per ounce. Three projects support that target: grade control drilling, a crusher and ore sorter due for commissioning in early 2027, and the conversion of the Pine Cove Mill to a gravity-CIL circuit.At the flagship Queensway Gold Project, the revised PEA outlines an after-tax NPV5% of C$1.728 billion and a 126% IRR at US$3,600 gold, with a Phase 1 head grade of 13.41 g/t. The Phase 1 Environmental Preview Report was registered on November 3, 2026, and Boyle expects a ministerial decision by year-end or early in the first quarter of 2027.The roughly C$150 million Phase 1 build is backed by C$167.1 million in cash, a further C$35 million of available debt and expected warrant proceeds. Management says the build is fully funded, including under a stress test at US$3,500 gold. Hammerdown cash flow is earmarked for G&A and exploration. The teams and processes built at Hammerdown are being transferred to Queensway ahead of first delivery to Pine Cove, targeted for Q4 2027.—Learn more: https://cruxinvestor.com/companies/new-found-goldSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 12, 2026 • 19min

Lahontan Gold (TSXV:LG) - Targets Q4 2027 First Gold Pour at US$820M NPV Santa Fe

Interview with Kimberly Ann, President, Founder, CEO of Executive Chair of Lahontan GoldRecording date: 10th November 2026Lahontan Gold Corp. (TSXV: LG) is advancing a restart of the Santa Fe Mine in Nevada’s Walker Lane. Santa Fe is a past producer that yielded over 359,200 oz gold and 702,000 oz silver between 1988 and 1995 through open-pit mining and heap leaching. Founder and CEO Kimberly Ann argued that the October 2026 PEA gives a deliberately conservative picture of the asset.The PEA base case uses US$3,600/oz gold and US$49/oz silver. It returns an after-tax NPV5% of US$820.0M and an IRR of 40.1% on initial capital of US$172.0M, including a US$22.2M contingency. Cash costs are US$1,909/oz and AISC is US$2,250/oz. The 11-year mine life averages 91,900 AuEq oz a year, rising to about 112,500 oz in years 4 to 11 after throughput expands from 12,500 tpd to 17,000 tpd. At October 13 spot prices of US$4,166 gold and US$59 silver, NPV5% reaches US$1.13 billion and IRR 50.4%.The central debate is the early schedule. Output in years 1 to 3 is lower, and the PEA payback is 3.68 years. Ann says about 200,000 oz on historic heap leach pads, already crushed, are not yet included because assays are pending. She estimates handling at about $5 a ton, with recrushing to improve permeability. First sonic results from 10 holes on Heap Leach Pad Two averaged 0.50 g/t Au and 3.3 g/t Ag, with a 40% average cyanide gold response. Ann says that once pad material is front-loaded, the company models payback near 22 months. That figure is not yet in a published study.A second source of legacy material is now under test. Lahontan outlined up to 100 RC holes averaging about 35 m into the Santa Fe East waste rock facility. The facility holds roughly 9.0 Mt mined between 1988 and 1992 under a 0.55 g/t cut-off, and the PEA already moves it as stripping. Ann said historic low-grade stockpiles have also returned assays above 1 g/t.On the path to production, the PEA completes the mine permit application. Ann is targeting permits around Q2 2027 and, with a contract miner committed to a six-month build, a first pour in Q4 2027. The company’s own illustrative roadmap shows first gold in 2028. Lahontan has NDAs with several debt providers and is targeting 80% debt and 20% equity. It is not pursuing a stream, and Santa Fe carries only a 1.25% royalty on 24 patented claims.Growth sits at West Santa Fe, 13 km away. 2025 drilling there returned 36.6 m at 3.11 g/t AuEq from surface, with 81% Au and 60% Ag cyanide-extractable recoveries, and a maiden resource is targeted for early 2027. The pending Emergent Metals acquisition would deliver 100% ownership, remove US$1.73M in payments, cancel 1% NSRs and add New York Canyon. Pad and waste rock assays, the Emergent vote and the permit decision are the next catalysts.Learn more: https://www.cruxinvestor.com/companies/lahontan-goldSign up for Crux Investor: https://cruxinvestor.com/subscribe
undefined
Nov 11, 2026 • 13min

Cabral Gold (TSXV:CBR) - Commercial Production Weeks Away, Resource Update by Year-End

Interview with Alan Carter, President and CEO of Cabral GoldOur previous interview: https://www.cruxinvestor.com/posts/cabral-gold-tsxvcbr-november-commercial-production-eyes-doubling-output-12183Recording date: 9th November 2026Cabral Gold (TSXV:CBR) has completed construction of its Phase 1 heap leach mine at the Cuiú Cuiú gold district in Pará State, Brazil, and is targeting a commercial production declaration before the end of 2026. The PFS scheduled a 12-month build, and Cabral finished in 10 months and on budget. A first gold pour of 1,130 oz was announced on September 10, 2026, and ramp-up ran through October and November.Phase 1 mines oxide material within 60 m of surface: soils, sediments and saprolite that need no drilling, blasting, crushing or grinding. The plant is designed for 3,000 tonnes per day. The July 2025 PFS by Ausenco Brazil targets 25,000 oz per year in the first 2 years at cash costs of US$950/oz, with an AISC of US$1,210/oz over the life of mine. Management is targeting 25,000 to 30,000 oz in the first year.The central change is funding. Cabral previously paid for drilling with equity raises, which diluted shareholders across a district with more than 50 untested targets. President and CEO Alan Carter said Phase 1 cash flow will more than cover exploration costs. Cabral is not anticipating further dilution, and Carter defined growth as market capitalization, value per share and share price. As of November 6, 2026, Cabral held C$68M in cash, and its market capitalization was C$448.4M. A US$45M gold loan funded construction. Principal repayments of 39 kg of gold per quarter begin on March 31, 2027.The larger prize is the hard rock. About 75% of the current resource of 670,480 oz Indicated and 527,320 oz Inferred is hard rock. Each of the 6 deposits is open at depth, and several are open along strike. Carter described central high-grade zones inside lower-grade stockwork halos. At Jerimum Cima, drilling returned 9.5 m at 87.4 g/t Au within a high-grade zone about 400 m long. Cabral is targeting a PEA on the Phase 2 hard rock mine in the third quarter of 2027, followed by infill drilling and a Phase 2 PFS in the fourth quarter. Carter expects Phase 2 capital to be much larger than Phase 1’s US$37.7M.The resource update targeted for the end of 2026 covers 6 deposits, against 3 in 2022, after about 50,000 m of drilling. Management’s target is above 2 Moz. Cabral has made 4 hard rock discoveries since 2022. Results outside the deposits include 27 m at 6.9 g/t at Central SE and boulders averaging 91.7 g/t at Alonso. Cuiú Cuiú lies on the same fault structure as G Mining Ventures’ Tocantinzinho, which produced 177,000 oz in 2025, and Carter was part of Tocantinzinho’s early discovery. Cuiú Cuiú produced an estimated 2 Moz of placer gold, 10 times Tocantinzinho’s total.Catalysts include the commercial production declaration, the year-end resource update, Phase 1 expansion details, the Phase 2 PEA, and Phase 1 cost control as loan repayments begin. Learn more: https://www.cruxinvestor.com/companies/cabral-goldSign up for Crux Investor: https://cruxinvestor.com/subscribe

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app