Volts

Getting more out of the grid we've already built

86 snips
Sep 13, 2023
The podcast discusses the lack of transmission capacity in the US and the potential of grid-enhancing technologies (GETs) to improve existing infrastructure. It explores dynamic line ratings as a real-time capacity determination method, topology optimization to reduce congestion, and the role of public advocacy in enhancing the grid. The chapter also highlights the resistance from utilities to deploy GETs at scale and the need for policy support to facilitate their adoption.
Ask episode
AI Snips
Chapters
Transcript
Episode notes
INSIGHT

Transmission Is The Primary Clean-Energy Bottleneck

  • US transmission capacity is the primary bottleneck for scaling clean energy and is desperately short.
  • Hundreds of GW wait in interconnection queues because lines are congested and new builds are slow.
INSIGHT

Congestion Costs Have Soared

  • Transmission congestion costs have grown dramatically, from roughly $6.5B (2016 scale) to over $20B nationally in 2022.
  • Rising congestion increases re-dispatch and forces curtailment of cheaper renewables, raising consumer costs.
INSIGHT

GETs Unlock Dormant Grid Capacity

  • Grid-enhancing technologies (GETs) use dynamic capabilities and digital monitoring to increase existing transmission capacity.
  • GETs are redeployable, making them flexible stopgap tools while new lines are built.