The KE Report

Magna Mining – Unpacking The Levack Mine Resource Estimate And Development Pathway Into Production

Nov 25, 2025
Jason Jessup, CEO and Director of Magna Mining, dives into the exciting Resource Estimate for the Levack Mine. He highlights impressive mineralization figures, including high-grade deposits at notable CuEq percentages. Discussion revolves around the future development plan, emphasizing the pathway to a Preliminary Economic Assessment and ongoing underground drilling. Jessup also explores the strategic flexibility in focusing on copper, PGMs, or nickel based on market conditions, and shares insights on the project’s long-term potential with estimated mine life exceeding a decade.
Ask episode
AI Snips
Chapters
Transcript
Episode notes
INSIGHT

Sizable Multi-Commodity Resource

  • Levack holds a sizable, multi-commodity resource with both contact and footwall mineralization.
  • High-grade footwall zones and contact-type deposits together support a robust restart plan.
ADVICE

Sequence Restart While Drilling

  • Move toward a construction/restart decision while running parallel exploration and drilling.
  • Use the upcoming PEA to sequence restart options and prioritize early hoisting and development work.
INSIGHT

Hybrid Access Optimizes Mining Zones

  • Morrison will likely be an early focus because it contains unmined veins and was in production until 2019.
  • A hybrid approach (surface ramp plus shaft access) lets the team exploit shallow keel zones and deep footwall deposits.
Get the Snipd Podcast app to discover more snips from this episode
Get the app