In this podcast we cover:
- Why making work ready is so important.
- The 17 items that must be in place for an item to be ready.
In this episode, I share what it really means to say a crew is ready for an activity. Too often, we move ahead before all the pieces are in place, which creates roadblocks, rework, and frustration. I break down the 17 components of true readiness, from conditions of satisfaction and support teams to materials, equipment, layout, and space. This is not a theory. These are practical checks that keep projects flowing smoothly and keep teams safe and productive. If you want to strengthen your planning process and eliminate waste, this discussion will give you the clarity you need.
If you like the Elevate Construction podcast, please subscribe for free and you’ll never miss an episode. And if you really like the Elevate Construction podcast, I’d appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw