

AEMO’s blueprint for wind, solar and storage
4 snips Dec 20, 2023
Merryn York, Head of system design at AEMO's, discusses the 2024 Integrated System Plan and transitioning away from coal generation. They also explore coordinating consumer energy resources, incorporating new policies into the ISP, transmission progress in New South Wales, longer-duration batteries in storage tenders, the hype and realistic uses of hydrogen, and renewable energy costs and bold predictions for the future.
Chapters
Transcript
Episode notes
1 2 3 4 5 6 7 8
Introduction
00:00 • 2min
Transitioning Away from Coal Generation
02:25 • 11min
Coordinating Consumer Energy Resources for Maximum Benefit
13:09 • 22min
Incorporation of New Policies into the ISP
35:26 • 9min
Transmission progress and renewable energy projects in New South Wales
44:08 • 3min
Longer-Duration Batteries in Storage Tenders
47:21 • 5min
The Hype and Realistic Uses of Hydrogen in the Energy Industry
52:21 • 2min
Renewable Energy Costs and Bold Predictions for the Future
53:52 • 6min