
The Great Train Robbery
Short History Of...
00:00
The Last Train Stop
The gang arrived with two Land Rovers at an Austin load-star truck. They brought that to the job with them and placed it at the bridge, ready for the train stopping. When they stopped the train at Brida-Go Bridge, they managed to take off about 120 of the packages. These are big sacks full of money and left, I believe, only five to eight packages behind. And they unloaded quickly and most of the guys said it was the hardest work they'd ever done in their whole lives.
Play episode from 17:59
Transcript


