Black Box Down cover image

The Troubled History of the Berlin Brandenberg Airport

Black Box Down

00:00

The Cost of Airport Construction

The expenditures for this airport and construction are at 4.3 billion dollars. And they've already spent half a million on lawsuits or something. The main wall of this new terminal building that they were building, this was for terminal one, I believe, faced West. Anytime it was windy and rainy, it was just coming straight into the building. So they had to like tear down a bunch of walls, take out all events, redesign all of that.

Transcript
Play full episode

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app