
American Nuclear: Failure to Learn, Destined to Repeat?
Decouple
The Secret Sauce of Integrated Project Delivery at Palo Verde
Palo Verde was a very, very tight integrated project sort of delivery before 3D computer-aided design. They used all nuclear-grade components even for systems that didn't require them. The EPC in cooperation with Bechtel and the APS worked incredibly closely together. And they also had real great cooperation when they were going up with the NRC due to regulatory changes.
00:00
Transcript
Play full episode
Remember Everything You Learn from Podcasts
Save insights instantly, chat with episodes, and build lasting knowledge - all powered by AI.