3min chapter

Main Engine Cut Off cover image

T+255: NSSL Phase 3 Addendum

Main Engine Cut Off

CHAPTER

The Revised Target for Satellite Launches

The offers proposed launch systems is capable of achieving at least fifteen thousand pounds massed orbit five hundred article miles circular orbits sixty three point four degree inclination with orbital accuracy probability dot a dot a dot as defined in these other documents. This can be achieved with a single launch or multiple launches minimum of one thousand kilograms per launch and multiple launch configurations. So they are now revising that target from i think it was eight tons before is what your back told me but now it's at six point eight metric tons uh... It does open up the range of new launch vehicles though it's getting trimmed with relativity having canceled turn one.

00:00

Get the Snipd
podcast app

Unlock the knowledge in podcasts with the podcast player of the future.
App store bannerPlay store banner

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode

Save any
moment

Hear something you like? Tap your headphones to save it with AI-generated key takeaways

Share
& Export

Send highlights to Twitter, WhatsApp or export them to Notion, Readwise & more

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode