Volts cover image

Making shipping fuel with off-grid renewables

Volts

00:00

The Cost of Hybrid Renewables

I'm wondering how much sort of over-building you do to try to boost that capacity factor. Like are you over-building and throwing away a lot of power just because it's so cheap? Yeah, we do a little bit of that. A typical project for us looks like 400 megawatts of renewables. And then we would probably put an electrolyzer that's around half the capacity next to that. So 200 megawatt input electrolyzer.

Play episode from 15:58
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app