
Fire Above the Cockpit / Swissair Flight 111
Black Box Down
00:00
M D 11 Wiring Corrective Action Plan
The m d 11 a, in its lifetime, between the time it was built between 19 88 and two thousand only about 200 of them were ever built. The first phase consisted three air worthiness directives that focused on the areas of concern high lighted in the t s b safety advisory. So they're just high lighting they went through all these planes, figured out what needed to be done, and they went through the process of correcting them all. And i'm going o ff top of my head her, i want to say they completed that in two thousand five.
Transcript
Play full episode