
Weapons of Mass Disruption
Malicious Life
00:00
The Air Gap Challenge in a Power Grid
Ukraine is divided into 24 regions, and each of them has a company responsible for the distribution system in its region. Jonatan stirem amit explains to us the fundamental architecture of a computer network in an industrial plant such as an electric distribution sub station. The air gap challenge being able to hop over from the i t network, which is often connected the internet, to the o t network, often disconnected completely.
Transcript
Play full episode