How to Save a Planet cover image

Should We Go Nuclear?

How to Save a Planet

00:00

The Cost Overrun of Nuclear Plants Built After 1970

On average plants built after 1970 had a cost overrun of 241%. That means that the final cost of these projects was on average nearly three and a half times what they originally budgeted. The authors of the report don't know for sure, but they looked at what could kind of fix the problem. They hypothesized that essentially that the nuclear industry hasn't really adopted advanced manufacturing and construction techniques.

Transcript
Play full episode

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app