Energy Unplugged by Aurora cover image

EP.151 Julian Leslie, Head of Networks and Chief Engineer, National Grid ESO

Energy Unplugged by Aurora

00:00

The Five Key Points of the Tech Amnesty

There is a risk that this storage device isn't doing what we expect it to do and therefore could be exacerbating a constraint or an issue on the system. That was triggering a whole host of works really long connection times. We should in the next few weeks, see some of the results of the storage policy that we put it though just been talking about. And then hopefully, well, we definitely will in the autumn. Those are the five sort of key points that we launched back in February and we've been working our way through each of those.

Transcript
Play full episode

Remember Everything You Learn from Podcasts

Save insights instantly, chat with episodes, and build lasting knowledge - all powered by AI.
App store bannerPlay store banner