AI-powered
podcast player
Listen to all your favourite podcasts with AI-powered features
Can Pickering Be Refurbished?
There's eight reactors at Pickering. Six of them are currently operating. Two of them have been mothballed. It does not mean that they are resurfaceable or I don't know how you. I mean, potentially, you know, the way we built can news again was we build four packs. And so there was Pickering A, which has four units brought online between 1971-1974 and Pickering B 1983 to 86. So then again, all six of those reactors puts out about 3.1 gigawatts, 3,100 megawatt hours every year.