
In the Studio: The Aquatics Centre, Paris Olympics 2024
The Documentary Podcast
00:00
The Construction of the Aquatic Centre Site
Today is a very important day for the construction of the Aquatic Centre site. The pedestrian bridge which connects the new swimming pool with the stud of horses been built off site and is today being creamed into position. Once completed the bridge will be around 100 meters long and 18 meters wide. Weighing 900 tons.
Play episode from 18:11
Transcript


