Is the Permitting Required?

The majority of the stations are public station. So i everyone wis in the system has aol of the station. We think that within the next six to nine months, will be able to build a station site. And what permitting steps are required? I bid wwill need this equipment. Is not a structure, just because of the way its felt. They come in kists, and you put them together and turn it on. Rigt now taks about two weeks to get e station up running. But generally, they certified as a piece of equipment that you can safely install eothe play.