Parley by The Hindu cover image

Is the Indian Railways stretched beyond its capacity? | The Hindu Parley Podcast

Parley by The Hindu

00:00

How to Correct Signaling Issues in ATP Systems

Kavaj is a plane control system and it has many additional features which are even available in systems like ETCS. In this particular case, the loop line was occupied and the distance of guards break one from the point where it entered into theloop line was hardly 100, 150 meters only. The breaking distance of such strains at 130 KMPH would be more than 600 meters. So it would have helped little bit in the sense that impact might have reduced, but it will not have prevented the accident.

Transcript
Play full episode

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app