
Is the Indian Railways stretched beyond its capacity? | The Hindu Parley Podcast
Parley by The Hindu
00:00
How to Correct Signaling Issues in ATP Systems
Kavaj is a plane control system and it has many additional features which are even available in systems like ETCS. In this particular case, the loop line was occupied and the distance of guards break one from the point where it entered into theloop line was hardly 100, 150 meters only. The breaking distance of such strains at 130 KMPH would be more than 600 meters. So it would have helped little bit in the sense that impact might have reduced, but it will not have prevented the accident.
Transcript
Play full episode