
[Episode #204] – Regulatory Reform
The Energy Transition Show with Chris Nelder
00:00
The Problem With Connecting Renewables to the Grid
The whole process of connecting renewables to the grid is just not working, he says. "I think we need a lot more to meridie" in regulatory and government model for system planning,. He adds: We built the grid in the 20th century using tools around engineering and integrated planning.
Transcript
Play full episode