4min chapter

Catalyst with Shayle Kann cover image

Understanding the transmission bottleneck

Catalyst with Shayle Kann

CHAPTER

The History of Transmission

In the 70s, there was a big transmission build out. Then for years, we did nothing. Why? Is it because we had built out what we needed and there wasn't demand? Or was it actually bottlenecks? The next phase was sort of 2008 to 2013 where there was a pretty significant build out mainly wind energy driven MISO multi-value projects. And so, taking together, those led to roughly 4,000 miles of high voltage meaning like 345 KV and above Trent lines built in the year 2014.

00:00

Get the Snipd
podcast app

Unlock the knowledge in podcasts with the podcast player of the future.
App store bannerPlay store banner

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode

Save any
moment

Hear something you like? Tap your headphones to save it with AI-generated key takeaways

Share
& Export

Send highlights to Twitter, WhatsApp or export them to Notion, Readwise & more

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode