3min chapter

When the Facts Change cover image

Could standardising housing drive down the prices?

When the Facts Change

CHAPTER

The Importance of Constructing Concrete Walls

Each floor of a building built out of solid concrete takes about three weeks. A typical projects, say with 50 or 100 apartments, might take 14 months by using our construction method. And it's just because we're able to overlap those two things in the normal stick build, as you called it. It's exactly what a piece of 4x2 is. It's a stick. That construction site leaks like a sieve until you've got the last flashing on the roof, then we can do it.

00:00

Get the Snipd
podcast app

Unlock the knowledge in podcasts with the podcast player of the future.
App store bannerPlay store banner

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode

Save any
moment

Hear something you like? Tap your headphones to save it with AI-generated key takeaways

Share
& Export

Send highlights to Twitter, WhatsApp or export them to Notion, Readwise & more

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode