The KE Report cover image

West Red Lake Gold Mines – Mid-Q4 Operations Update At The Madsen Mine,  Ongoing Ramp Up Towards Commercial Production In Q1 Of 2026

The KE Report

00:00

From PFS to detailed mine design

Shane contrasts the high-level pre-feasibility model with tighter six-to-eight meter infill drilling used for mine design.

Play episode from 10:28
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app