
Site Reliability Engineering – (Still) Monitoring Distributed Systems
Coding Blocks
The Big Table, the T Is Not Capitalized. Drives Me Crazy
Gogo dialed back the serviceable objective to 75 percent. Tile didn't, i don't think they said what it was before, maybe 90 fifth. But basically it meant less alert, and they disabled email alert. And they did this until they were able to go and actually fit fix the root cause problems.
00:00
Transcript
Play full episode
Remember Everything You Learn from Podcasts
Save insights instantly, chat with episodes, and build lasting knowledge - all powered by AI.