Lead Time: The Biggest Engineering Constraint
Matt and Robin emphasize lead times for parts, machine shops, and testing as the primary bottleneck for DS2.
Play episode from 21:25
Transcript

Matt and Robin emphasize lead times for parts, machine shops, and testing as the primary bottleneck for DS2.