
[Weekend Drop] Swyx interview on FreeCodeCamp podcast
The Swyx Mixtape
00:00
Is There a Two Pea Team?
A product manager trying to get things done with an ineffectual team. A lot of organizations just ire, entirely too many people and they don't nectaly hire the right people. The maximum team size that should be on any project is however many can be fed by ordering two pizas.
Transcript
Play full episode