2min chapter

The Second Studio Design and Architecture Show cover image

#346 - Tips for Bathroom Design - Layout, Feeling, Lighting, Future-Proofing and More

The Second Studio Design and Architecture Show

CHAPTER

How to Plan a Bathroom for Construction

The last thing is timeline. It takes a while to get materials and plumbing fixtures delivered to the construction site when you need them. As soon as you are fairly certain, it's going to take place at some point. Start talking professionals right then and there. Most of the time, and really is very often clients underestimate how long things take to be designed, approved,. built, and for materials to arrive.

00:00

Get the Snipd
podcast app

Unlock the knowledge in podcasts with the podcast player of the future.
App store bannerPlay store banner

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode

Save any
moment

Hear something you like? Tap your headphones to save it with AI-generated key takeaways

Share
& Export

Send highlights to Twitter, WhatsApp or export them to Notion, Readwise & more

AI-powered
podcast player

Listen to all your favourite podcasts with AI-powered features

Discover
highlights

Listen to the best highlights from the podcasts you love and dive into the full episode