Energy Gang cover image

The Energy Gang at the London Hydrogen Conference – Part 1

Energy Gang

00:00

Electrolyzer Capacity and Feasibility of 200 GW Goal

An exploration of the need for increased electrolyzer capacity in Europe to meet green hydrogen production targets by 2030, and the challenges of achieving the goal of 200 gigawatts of capacity. The chapter also discusses the potential for technology advancements and cost reductions to drive significant growth in hydrogen production.

Transcript
Play full episode

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app