Catalyst with Shayle Kann cover image

Getting more energy on the wires

Catalyst with Shayle Kann

00:00

How to Defer the Need for a New Transmission Line

In the utility world, we would talk about nonwares alternatives as a way to help you defer the need for different kinds of infrastructure investments. It takes a long time to build a transmission line right now and it's filling in while we're waiting for the new transmission line to come on. HVDC technology is easier to interface with the AC grid so you can think about putting DC in more places. If you underground, for example, in a highway, you're now not requiring new right of way. You're using your existing right of way; you're moving a ton of power. We already underground a lot of electricity in the US. A lot of cities have underground distribution systems

Play episode from 39:00
Transcript

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app