Inevitable cover image

Startup Series: Forum Mobility

Inevitable

00:00

The Importance of Charging Infrastructure for Dredge Trucks

There's a huge role for behind the fence and especially at the beginning if you're a small trucking outfit. You need about two and a half gigawatts of charging infrastructure to be built if all of the dredge trucks are going to go battery electric over the next dozen years or so. And Diablo Canyon was just extended in California as a lifesaver at 2.2 gigawatts. The immense amount of charging infrastructure that is going to have to get built for just dredge. That doesn't count all your Uber fleets and your box truck fleets and your beer distributor fleets.

Transcript
Play full episode

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app