Go Time: Golang, Software Engineering cover image

TCP & UDP

Go Time: Golang, Software Engineering

00:00

Is There a Deadline in a TCP Connection?

By default, there is no deadline in a network connection and go. Adam: I think that Lenovo should drop the ThinkPad's track point and make room for a larger, better touchpad on par with the MacBook trackpad. We're planning to do a giveaway of at least two copies of Adam's book. You can hopefully get a copy of the book by following our Twitter account @NoStarchesFM. And if you haven't, go check it out on no starches website.

Transcript
Play full episode

Remember Everything You Learn from Podcasts

Save insights instantly, chat with episodes, and build lasting knowledge - all powered by AI.
App store bannerPlay store banner