Go Time: Golang, Software Engineering cover image

TCP & UDP

Go Time: Golang, Software Engineering

00:00

Is There a Deadline in a TCP Connection?

By default, there is no deadline in a network connection and go. Adam: I think that Lenovo should drop the ThinkPad's track point and make room for a larger, better touchpad on par with the MacBook trackpad. We're planning to do a giveaway of at least two copies of Adam's book. You can hopefully get a copy of the book by following our Twitter account @NoStarchesFM. And if you haven't, go check it out on no starches website.

Transcript
Play full episode

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app