The Jim Rutt Show cover image

EP 183 Forrest Landry Part 2: AI Risk

The Jim Rutt Show

00:00

The Role of Predictability in Engineering

In something as mundane as a bridge, we can't get to absolute certainty about the safety of a design. So rather than being a mathematics problem, it has to be thought of as an engineering problem. We have literally no information about what the interior state of this thing is going to be at some arbitrary point in the future. And so there's a kind of inherent limit to the predictability itself which is not tractable using the kinds of tools of algorithms that would work really well in other fields of engineering.

Transcript
Play full episode

The AI-powered Podcast Player

Save insights by tapping your headphones, chat with episodes, discover the best highlights - and more!
App store bannerPlay store banner
Get the app