
Amplitude's John Cutler on Why PMs Should Measure Themselves on Value Creation Not Output
Build with Maggie Crowley
What Does Scrum Really Mean?
The team is alined around making that sprint goal happen. They don't even figure out all the stories ahead of time. And they have the absolute ability to, you know, remove scope or do whatever's possible to try to get something that's potentially releasable by the end of that thing. So this is often missed. The worst thing that would happen is you drop all these balls and cut all these corners to be able to do what you said you were going to do every single month.
00:00
Transcript
Play full episode
Remember Everything You Learn from Podcasts
Save insights instantly, chat with episodes, and build lasting knowledge - all powered by AI.